The pilot-phase for EMD® Joule locomotive is expected to be launched in 2H20 at Tubarão Unit (in Vitória, in the state of Espírito Santo, Brazil). The equipment is under the construction phase at the Progress Rail's industrial plant in Sete Lagoas (Minas Gerais state). EMD Joule's batteries will provide a 1.9 MWh storage capacity, expandable to 2.4 MWh, which means being able to operate up to 24 hours with no need to recharge.

This 100% electric switchyard locomotive is part of the PowerShift Programme to replace Vale's energy sources with clean ones. This initiative contributes to Vale's strategy to reduce its direct and indirect emissions (scope 1 and 2) by 33% until 2030, as of 2017. This goal complies with the Paris Agreement.

Railroad emissions currently account for almost 10% of Vale's total scope 1 and 2 emissions. Thus, if this technology is proven to be feasible, the electric equipment may contribute to the reduction of railroad emissions.

According to Gustavo Bastos, Executive Manager at Vale's Centre of Excellence and Innovation, tests with the pilot-locomotive for maneuvering operations, in Tubarão, are paramount to develop a conceptual solution for regular locomotives operating in the railroads. "This equipment is a landmark on the strategy of decarbonisation of Vale's assets, and it is in compliance with the New Pact with Society," said Bastos.