
Castillo Copper to advance copper projects with key appointment
Entech Mining will undertake a pit optimisation and mine design study for the Big One Deposit (NWQ Copper Project Mt Isa copper belt), which has an inferred JORC MRE at 2.1 Mt @ 1.1% Cu for 21 886 t copper metal.





